NEWS

Rediff.com » News

Why the launch of GSLV-D5 rocket is crucial to India
January 05, 2014
The launch is crucial for India as it seeks to prove the design, realisation and sustained firing of its indigenously built cryogenic engine after two back-to-back failures of the GSLV flights in 2010 -- the first, with an indigenous cryogenic engine, on April 15 and the next -- with a Russian cryogenic engine, on December 25.

The launch of the last GSLV was called off at the eleventh hour due to a fuel leak in its second stage -- in a setback to the mission to test its homegrown cryogenic engine -- after its failure three years ago.
© 2024 Rediff.com